EVInstallHub

EV Charger Installation Cost in Burbank, California

Typical cost for a Level 2 home charger installation: $650$1,500 in Burbank, California

Verified local research

Local EV Charger Installation Factors in Burbank

Checked 2026-05-12

Burbank is a municipal-utility city with older 1961 median housing stock, so EV charger quotes often need to coordinate city electrical permits with BWP meter-spot or service-capacity review. The city also publishes a specific EV charger permit-fee line, making the permit-cost component more transparent than in many nearby Los Angeles-area markets.

Permit path

Permit required: Yes

Burbank requires building permits for alterations and repair or maintenance involving electrical work, and its permit page lists electrical outlets, fixtures, panelboards, and electrical service upgrades as permit-counter or online permit examples. The same page says an electrical service upgrade requires a Burbank Water and Power meter spot, which is important when a Level 2 charger triggers panel or service work.

Published permit fee: Electric vehicle charger permit fee $249.19, plus plan check fee $280.21 when required

City permit source

Utility and incentives

Primary utility: Burbank Water and Power

Burbank Water and Power Charge at Home Residential EV Charger Rebate: Up to $1,500 for purchasing and installing one or two Level 2 charging stations, including eligible panel-upgrade costs

Burbank Water and Power's Charge at Home page offers up to $1,500 toward Level 2 charging station purchase and installation, and approved EV charger rebate recipients are enrolled in BWP's EV time-of-use rate for one year. That makes charger selection, install timing, and off-peak charging behavior part of the local cost story.

Home and electrical context

Median home age: 65 years

Housing pattern: urban

Power cost and climate

Residential electricity rate source: $0.1800 first 300 kWh; $0.2782 all additional kWh/kWh

IECC climate zone: 3B

Burbank is in hot-dry IECC zone 3B, so outdoor or carport-mounted EVSE should account for summer heat, UV exposure, wildfire-smoke seasons, and conduit runs exposed to dry Southern California weather.

Sources used for this city

EV Charger Installation Cost Breakdown in Burbank

Labor rate tier for California: Higher than average (high cost-of-living state)

Installation TypeTypical Range
Level 1 Charger (120V)$200$650
Level 2 Charger (240V) ✓ Most Popular$650$1,500
Level 2 + Panel Upgrade$2,500$5,250
Level 2, Outdoor Install$800$2,000

* Estimates are for Burbank, California. Prices vary by installer, home configuration, and permit fees. Get quotes from local pros for accurate pricing.

What Affects EV Charger Installation Cost in Burbank?

  • Panel capacity & location

    If your electrical panel is older or at capacity, you may need an upgrade ($1,500–$3,000). The further the panel is from your garage, the more wiring is needed.

  • Wiring distance

    Runs under 25 ft are cheapest. Longer runs or runs through finished walls add $200–$1,200+ depending on complexity.

  • Indoor vs. outdoor installation

    Outdoor installs require a weatherproof NEMA 3R enclosure and conduit, adding $150–$400 to the total.

  • Permits & inspections

    Burbank requires building permits for alterations and repair or maintenance involving electrical work, and its permit page lists electrical outlets, fixtures, panelboards, and electrical service upgrades as permit-counter or online permit examples. The same page says an electrical service upgrade requires a Burbank Water and Power meter spot, which is important when a Level 2 charger triggers panel or service work. Published city fee: Electric vehicle charger permit fee $249.19, plus plan check fee $280.21 when required.

Ready to get quotes in Burbank?

Compare local EV charger installers, read reviews, and get free quotes — all in one place.